Making Window Screens -- The Frame
Making window screens requires a little
patience and a little hand-to-eye coordination.
Like most skills, the more you do the better you get.

Spline Groove -- the recessed area where the Spline is
inserted to lock the screening in place
Spline Side -- the side of the frame with the Spline Groove
Smooth Side -- the side of the frame without the Spline Groove
Inside each screen frame kit is an assembled frame sample. Take the
sample apart. See how the miter cuts are made -- with the spline groove
on the short side. See how the corners are inserted -- there is a
right way and a wrong way.
To remove one of the tension springs, place the shaft of a screw driver
between the screen frame and the tension spring. Press down on the
tension spring at it's highest point. The spring will release from its
anchor hole. Measure the distance between the holes that hold that
tension spring. You will need to drill your holes the same distance
apart. Study how the pull tabs and the center bar clips are installed.
Understand what holds them in place.
Cutting the Frame
When you understand how the frame is assembled, you are ready to cut the frame to size. Use the philosophy that it is more materially efficient and less labor intensive to measure twice and cut once. Make each cut at a 45 degree angle just like the sample. After each side is cut, re-measure it to be sure it is the correct length.
When the four sides are cut, take the side that gets the tension springs and drill the holes for each tension spring. Space the holes for each tension spring the same distance apart as on the sample frame. The tension springs are usually located about 4" from the corners of the frame. Install the tension springs then assemble the sides using the corner inserts.
For Extruded Frame Only
If you are using extruded frame, you will need to set the corner inserts. Put the assembled frame on your work surface with the spline side up. With a punch, or a chisel, or a screw driver, and a hammer, dimple each end of each piece of frame. This will draw the frame tight to the corner insert.
Blocking the Screen Frame
You must block the screen frame in place on your work table. If you don't
the sides will be pulled out of square and will be bowed in during the
screening process.
Place the screen frame in position on your work table with the spline side
up. Using your square make sure the corners are at 90 degrees. Set a block
in one corner. Drive one of the 3/4" nails through the center of
the block and into your work surface.
Using the same method, block the other three corners. Re-check each
corner to make sure it is square. Using the diagram on the
right,
install your middle blocks. If your screen will not have a center
bar, you will still need to block the middle of the screen to keep
the sides from bowing in during screening.
The Center Bar
If your screen will have a center bar, measure down from the top of your screen and mark the location of the center bar on both sides of the frame.
The length of the center bar will be the width of the screen minus
twice the width of the aluminum frame.
(CB Length = Screen Width - 2(Frame Width)
For Example :
If your Screen size is 36" x 60", then the width of the screen
is 36".
If you are using 5/16" x 3/4" aluminum framing then the width of
the framing is 3/4". The center bar length is 34.50", the width
of the screen (36") minus
twice the width of the frame (1.5")
CB Length = Screen Width - 2(Frame Width) = 36" - 2(3/4") =
36" - 1.50" = 34.50"
You will use the aluminum framing to make your center bar. Cut the center bar with straight cuts -- not miter cuts.
Lay the center bar in position with the spline side up.
Pull the sides of the frame tight against the center bar and measure to
insure that the width of your screen in the middle is the same as the width
of your screen at to top and bottom.
Lift one end of the center bar and insert a center bar clip, being careful
to leave the end of the clip exposed. If you push the center bar clip all
the way into the center bar it will wedge and can not be removed. Return
the center bar to its position on the table, with the end of the center
bar clip over the frame in in the spline groove. Take the opposite end
of the center bar, insert the center bar clip and repeat the
installation process.
The Pull Tabs
Place the pull tabs next to the corner blocks, as shown in the diagram above, with the edge snapped into the spline groove.
Now you are ready to begin screening . . .
